RFP, GeoTag / geotech, specs, OST export, vendor workbook. BidFlow reads it onto this bid's register. You still check every number.
You are on a walkthrough bid (Sandow 138/34.5 kV Bay Addition). Start Red Hills empty, or keep dropping here to mix sample lines with live files — usually you do not want that.
Or paste an Excel / OST block
Labor sub sent a number
Plug it like a vendor return. It writes labor $ onto that line instead of hours × crew rate.
Stamp vendor terms once
Lead, validity, warranty, freight — type them here if the quote came in sideways. Bid to Win carries them.